King Township Wide Rec Centre

King Township Wide Rec Centre

King City, ON

Project Delivery Type

Stipulated Sum

Project Value

$82,700,000

Completion Date

July 2022 – July 2024

Size

11,600 m2

Architect

MacLennan Jaunkalns Miller

Client

Township of King

Construction of a new 11,600m2 recreational centre to supplement the Township’s growing demand for recreational programming. The new recreation centre will be built on approx. 25 acres of land adjacent to the Seneca College King Campus. The facility is a single storey recreational complex which includes two (2) NHL sized ice rinks, one of which will have the capacity for approx. 450 spectators through a mixture of fixed seating and standing room, an aquatic hall including an indoor six (6) lane lap pool and a separate leisure pool, fitness & athletic spaces, multi purpose community rooms, offices, administrative spaces and a landscaped courtyard.

Though the project is not targeting LEED accreditation, the project has been designed with an emphasis on sustainable design features such as an open-loop geo-exchange field, high performance envelope and roof assemblies, natural ventilation and heat recovery systems, energy efficient lighting and equipment and low water consumption processes.

The project is targeting substantial completion for May 2024, and total completion for July 2024. However, the Owner has requested a partial turn-over and occupancy of a least one (1) of the ice rinks for January 2024.